Compare the complete operating system
Include procurement, storage, hauling, waste, labor, water, energy, chemicals, equipment, setup and operational continuity.
Use current project inputs
A useful comparison uses local costs, actual service volume and the length of the interruption rather than a generic savings claim.
Record the assumptions
Make the decision auditable by listing every cost, duration and service-level assumption used in the comparison.